Contractors use these words loosely. Here's what each usually means, and the two questions that matter more than the label.
GUIDE · THE WORDS
What each one usually means
Word
Usually means
Can the price change?
Estimate
A ballpark, often before details are settled
Yes, often
Quote
A set price for a described job
Only if the job changes
Bid
A price submitted to compete with others
Usually fixed once accepted
Ask these two questions instead
"Is this a fixed price for the work described?"
"How long is this price good for?"
The answers matter more than what the paper is called. Get both in writing.
Watch for allowances. A line like "$500 irrigation allowance" is a placeholder. The final cost can come in higher or lower, even on a "quote."
THE HOMEOWNER'S QUOTE KIT
Turn any of them into a real price.
The Quote Kit helps you get every contractor pricing the same job in writing, with copy-ready questions and a worksheet to compare them. 10 printable pages.